Jetty, Barnsley

Douglas Fir Jetty going to reach out into a large farm pond north of Sheffield. Built completely in the workshop and just about extracted and loaded onto a lorry with the millimetre precision telehandler driving skills Chris Pocock, for installation by the client. There is a flat topped boulder in the middle of the pond and a rock shelf on the bank to sit it on, with a seven metre span between. the posts are all coach bolted through the massive 300x80mm main beams and the routed handrails mortise and tenon draw dowlled into the posts. We added two grip strips per deck board to make it safe under foot.